CONSTRUCTION COMMENCES ON PINGLU CANAL WATERWAY PROJECT IN CHINA

Samoa Cable Tray Construction Project

Samoa Cable Tray Construction Project

Samoa Submarine Cable Company Limited (SSCC) announced today that the contract signed with Alcatel-Lucent Submarine Networks (ASN), to roll out the Tui-Samoa Cable is in force. The second largest of its islands, Upolu, is home to 70% of the population, while Savai'i (the largest island) is home to nearly 30%, with about 1,000 people living on two small outer islands, Manono and Apolima. The Tui-Samoa cable is an eight-terabit system that will connect Samoa, the territories of Wallis & Futuna, and Vanua Levu to Suva on the Fiji mainland. 0km, Articulated Pipes installation, Beach Burial, Inshore Burial by Air-lifts Tuasivi, Samoa – DSE 2. The Asian Development Bank (ADB) has supported the Government of Samoa and the Samoa Electric Power Corporation (EPC) to upgrade the transmission and distribution system in Samoa.

Read More
China Unicom Optical Cable Laying Construction

China Unicom Optical Cable Laying Construction

China Unicom Group, one of China's major telecommunications operators, has revealed plans for the construction of a nearly 3,000-kilometer-long submarine optical fiber cable, which will span from Hong Kong to Sihanoukville in southern Cambodia. The proposed EMA (Europe-Middle East-Asia) cable would connect Hong Kong to China's island. It accelerates the construction of network infrastructure and actively plans computing power , enhanced the breadth and depth of mobile network coverage and user perception. An image taken on May 10 shows a vessel laying submarine cables off Lingshui, Hainan province, to support the building of China Unicom's international submarine cable landing station.

Read More
Wiring of the three-level distribution box during construction should be kept away from

Wiring of the three-level distribution box during construction should be kept away from

The principle of minimizing distribution distances means that the distances between distribution boards and switch boxes should be kept as short as possible. (3) Power distribution from tertiary switch boxes to electrical equipment must follow the "one machine, one switch" principle, with no branching allowed. Choose the right box based on environment (indoor/outdoor), load capacity, and durability. Ensure safe placement: install in dry, accessible areas with good ventilation and at appropriate height (typically ~1. This fact sheet explains how to apply the requirements shown in AS/NZS 3012:2019 Electrical installations – construction and demolition sites (AS/NZS 3012:2019), which is called up as a mandatory standard by section 163 of the Work Health and Safety Regulation 2025 (WHS Regulation).

Read More
Construction of optical cable lines for transmission networks

Construction of optical cable lines for transmission networks

The construction procedures of general optical cable lines are mainly divided into five stages: preparation, laying, connection, testing and completion acceptance. It includes first determining the type of communication system (s) which will be carried over the network, the geographic layout (premises, campus, outside. They support high-speed, interference-resistant communication and are particularly effective in applications that require high bandwidth, low latency, and strong signal integrity. However, they are composed of many components, each constructed from advanced materials to guarantee the quick and reliable transmission of data. ◆ Specifically, we have developed a lineup of technologies for automatic rotation alignment connection of MCFs, interconnection and branching technology between MCFs and existing optical fibers, connection and branching technology between MCFs and existing optical cables, and in-station MCFs.

Read More

Get In Touch

Connect With Us

📱

Poland (Sales & Engineering HQ)

+48 22 538 72 19

🇪🇺

Germany (EU Technical Support)

+49 30 983 21 44

📍

Headquarters & Manufacturing

ul. Postępu 14, 02-676 Warszawa, Poland