WORKFLOW FOR PROVISION OF CONSTRUCTION SITE POWER SUPPLY

Where should the main power distribution box be placed on the construction site

Where should the main power distribution box be placed on the construction site

The main distribution box shall be located in the area close to the power supply; the distribution box shall be installed in the area with relatively concentrated electrical equipment or load; the distance between the distribution box and the switch box shall not exceed. The power distribution system at the construction site shall be distributed in different levels. Choose the right box based on environment (indoor/outdoor), load capacity, and durability. Unlike residential or industrial panels designed for long-term installations, these boards are built for mobility, durability, and flexibility. This fact sheet explains how to apply the requirements shown in AS/NZS 3012:2019 Electrical installations – construction and demolition sites (AS/NZS 3012:2019), which is called up as a mandatory standard by section 163 of the Work Health and Safety Regulation 2025 (WHS Regulation).

Read More

Get In Touch

Connect With Us

📱

Poland (Sales & Engineering HQ)

+48 22 538 72 19

📍

Headquarters & Manufacturing

ul. Postępu 14, 02-676 Warszawa, Poland