TUNISIA UNVEILS TENDER FOR 200 MW SOLAR POWER

200 meters of 4-core optical fiber cable

200 meters of 4-core optical fiber cable

0mm diameter armored jacket and a length of 200 meters, this cable supports SC, FC, and LC connectors and offers an optional cable car system for easy deployment in challenging environments. From the trusted RS PRO brand, this four-way fibre optic cable has a robust LSZH outer jacket suitable for more rugged applications. Perfect for home labs, enterprise networking, and high-speed data transfers, these. 8 mm + FRP + Yarn Our 4 Core FTTH Single Mode Optical Fiber Cables are designed to meet the high demands of modern telecommunications networks.

Read More
Myanmar Power Fiber Cable Tender

Myanmar Power Fiber Cable Tender

The Ministry of Electric Power, Department of Power Transmission and System Control, invites tenders for the Turnkey project under the consecutive fiscal year budget for replacing the ACAR conductor with ACCC conductor using the live line system on the 132 kV Tigyit–Kalaw. The official source for Myanmar government procurement is the e-Tendering portal of the Public Procurement Management System (PPMS). GlobalTenders aggregates tenders from Myanmar's official, authorities and agencies websites. TendersOnTime, the most comprehensive database for Government Tenders and International Tenders; collects information on Cable from. Find, search and filter Tenders/Call for bids/RFIs/RFPs/RFQs/Auctions published by the government, public sector undertakings (PSUs) and private entities. Stay updated with live tender notices from Yangon, Mandalay, Bago, Sagaing, Monywa, Myitkyina, Naypyidaw, and Mawlamyine across the Myanmar e-procurement portal.

Read More
200 Cable tray support installation distance

200 Cable tray support installation distance

The NEC requires that cable trays must be supported by members at an interval specified by the cable tray manufacturer, but not more than 5 feet for horizontal runs to support the weight of the cables and other loads. 8 (Other Mechanical Stresses (AJ)) in that document provides requirements for cable support. This spacing is crucial for adequate maintenance access, ease of inspection, and ensuring proper airflow for effective heat dissipation.

Read More
Exfo Optical Time Domain Reflectometer 200

Exfo Optical Time Domain Reflectometer 200

Read moreEXFO FTB-200 handheld modular platform with FTB-7200D-023B module. No part of this publication may be reproduced, stored in a retrieval system or transmitted in any form, be it electronically, mechanically, or by any other means such as photocopying, recording or otherwise, without the prior writt eved to be accurate and reliable. It is capable of measuring the length and attenuation of optical fibers, including the fusion and switching of optical fibers, and can also be used to locate the fault point of optical. QUEBEC CITY, April 27, 2023 — The D-Series of Optical Time Domain Reflectometer (OTDR) solutions from EXFO are advanced field testing tools that deliver highly accurate measurements to characterize and validate fiber links.

Read More
Tunisia power distribution box project

Tunisia power distribution box project

The project comprises five (5) main components: (i) construction of new infrastructure; (ii) rehabilitation of the MT networks; (iii) rehabilitation of the LT networks; (iv) procurement of equipment and resources for studies and operations, and (v) engineering designs, works. TUNIS, November 11, 2025 — The World Bank and the Government of Tunisia have concluded a financing agreement to support Tunisia's energy sector modernization agenda through the Tunisia Energy Reliability, Efficiency, and Governance Improvement Program (TEREG). Tunisia has a current power production capacity of 5,944 MW installed in 25 power plants, which produced 19,395 gigawatt hours in 2024. Revised in November 2024, this map provides a detailed view of the energy sector in Tunisia. The locations of power generation facilities that are operating, under construction or planned are shown by type – including gas and liquid fuels, natural gas, hybrid, hydroelectricity, solar (PV and CSP). The proposed project aims at strengthening Tunisia's electricity transmission system and improving power and gas distribution systems. In 2014, STEG operates a 6 209 km of transmission network distributed as follows : In addition to their function to meet a perpetual growing demand, the new works will allow us to minimize the risks of obsolescence and to prepare our network to play its role as a link in a large system.

Read More

Get In Touch

Connect With Us

📱

Poland (Sales & Engineering HQ)

+48 22 538 72 19

📍

Headquarters & Manufacturing

ul. Postępu 14, 02-676 Warszawa, Poland