THE LATEST FTTH INSTALLATION EQUIPMENT FOR 2024 FIBRE

Latest Certification of Low-Voltage Complete Sets of Equipment

Latest Certification of Low-Voltage Complete Sets of Equipment

CE LVD is a mandatory EU safety certification for low-voltage electrical equipment. The low voltage directive (LVD) (2014/35/EU) ensures that electrical equipment within certain voltage limits provides a high level of protection for European citizens, and benefits fully from the single market. This is the most accurate, up-to-date overview of CE LVD for 2026, based on daily compliance work. On the 22nd of July 2025, the European Commission published the Commission Implementing Decision 2025/1488, which amends the Implementing Decision 2023/2723 to published.

Read More
Network rack equipment installation location

Network rack equipment installation location

A well-chosen spot reduces cable clutter and enhances your network's performance. When planning your rack installation, one of the first things to do is to select the right rack type and check that its size suits your equipment and future additions. If you plan to use the rear cable management bracket, allow 8 rack nits (14 inches or 35. Before using a particular rack, check for obstructions (such as a power strip) that could i. Networking equipment housed within the server rack should be installed in the upper portion of the cabinet to simplify cable management. In this video I show you how I mounted a Tripp Lite SRW12US SmartRack 12U Wall Mount Rack Enclosure Cabinet.

Read More
Cable tray crossarm support equipment

Cable tray crossarm support equipment

When working live and there is a need to change a crossarm, it is important to lift the existing conductors away from the work area. This can be achieved through many different techniques using a multitude of accessories - auxiliary arms, pole saddles, wire saddles, link sticks. When developing our cable support OBO can offer reliable solutions for systems, three attributes are at the routing and fastening cables securely core of what we do: efficiency, resil- for each of these installation challeng-ience and safety. Our cable trays are produced in fit for purpose materials like stainless steel, galvanized, aluminium and fibreglass (FRP/GRP) composites to suit any project type both offshore and onshore. Sizes and designs can be individually selected and special dimensions are available on request.

Read More
Installation height of fire alarm light module

Installation height of fire alarm light module

Not less than 2300 mm above the floor (where ceiling heights allow) measured to the centre of the device. NFPA is offering a free graphic that shows installation requirements for fire alarm equipment such as pull stations, smoke and heat detectors, notification appliances, and control equipment. A comprehensive, step-by-step Method Statement for Fire Alarm System Installation. Maximum spacing is defined by the detector's listed coverage, commonly up to 50 ft (15 m) on smooth ceilings. Manual Call Points (Manual Fire Alarm Boxes) maximum travel distance to a manual box.

Read More
Installation of seismic-resistant supports for air duct cable trays

Installation of seismic-resistant supports for air duct cable trays

Seismic braces can be flexible using aircraft quality cables, or rigid (solid) using steel sections such as pipe, angles, or strut channels. Braces are typi-cally installed 30-40 ft (10-13 m) apart, at system turns and at the end of runs. Suspended systems such as piping, equipment and ductwork need seis-mic braces to keep them from swaying during an earthquake. Our strong legacy includes OSHPD OPA and OPM approvals, Structural Engineer approvals, and compliance with Internation-al Building.

Read More

Get In Touch

Connect With Us

📱

Poland (Sales & Engineering HQ)

+48 22 538 72 19

📍

Headquarters & Manufacturing

ul. Postępu 14, 02-676 Warszawa, Poland