SAFETY ANALYSIS ON CONSTRUCTION SUPPORTS FOR LONG SPAN

Safety briefing for communication tower construction

Safety briefing for communication tower construction

From using personal protective equipment (PPE) to implementing height safety protocols, electrical hazard precautions, and emergency response plans, this article explores the best practices that every tower construction project should follow. The Occupational Safety and Health Administration and the Federal Communications Commission are concerned about the risks faced by employees in the communication tower industry. Employees climb communication towers to perform construction and maintenance activities and face numerous hazards. Whether building telecommunications, power transmission, or other types of towers, the safety of workers is the top priority.

Read More
Relay Protection Safety Risk Analysis

Relay Protection Safety Risk Analysis

Hidden fault refers to a system failure has no effect on the system during normal operation, and when to change some parts of the system, the fault will be triggered and thus lead to the occurrence of cascading failure. Is the main function of relay protection in power system appear natural, artificial or equipment failure, failure to timely, accurate cutti.

Read More
Construction of seismic-resistant supports for air ducts and cable trays

Construction of seismic-resistant supports for air ducts and cable trays

Suspended systems such as piping, equipment and ductwork need seis-mic braces to keep them from swaying during an earthquake. Seismic braces can be flexible using aircraft quality cables, or rigid (solid) using steel sections such as pipe, angles, or strut channels. The seismic restraint of pipe and duct is a task that requires several disciplines and trades to interface well in order to pr duce a building that meets the intent of the code. Many attachment examples and arrangements are presented, including anchors and the use of special devices called seismic restraint devices. The Easyex EFSCK Series Seismic Cable Restraint Kits are engineered to secure suspended non-structural components—such as ductwork, piping, conduit, cable trays, and HVAC equipment—against seismic, wind, and blast forces.

Read More
External scaffolding three-level distribution box for construction sites

External scaffolding three-level distribution box for construction sites

A multistage three-phase distribution box for a construction site comprises a base, wherein a protective cover with a mesh structure is arranged on the top surface of the base, three distribution boxes with the same structure are slidably mounted inside the protective. That is why E-abel designs temporary distribution boxes as complete outdoor power systems, not just painted metal cabinets with sockets on the side. The design shown in the reference images brings together an IP-rated outdoor electrical enclosure, industrial CEE socket distribution box layout. Contractor to which this Technical Specification applies: This specification applies to the. Scafom-rux offers smart, reliable solutions for scaffolding storage and transport logistics with our range of stackable pallets, mesh boxes, and modular storage items. Above all, ladders are suitable for climbing to a higher working position or for performing quick jobs such as.

Read More
Wiring of the three-level distribution box during construction should be kept away from

Wiring of the three-level distribution box during construction should be kept away from

The principle of minimizing distribution distances means that the distances between distribution boards and switch boxes should be kept as short as possible. (3) Power distribution from tertiary switch boxes to electrical equipment must follow the "one machine, one switch" principle, with no branching allowed. Choose the right box based on environment (indoor/outdoor), load capacity, and durability. Ensure safe placement: install in dry, accessible areas with good ventilation and at appropriate height (typically ~1. This fact sheet explains how to apply the requirements shown in AS/NZS 3012:2019 Electrical installations – construction and demolition sites (AS/NZS 3012:2019), which is called up as a mandatory standard by section 163 of the Work Health and Safety Regulation 2025 (WHS Regulation).

Read More

Get In Touch

Connect With Us

📱

Poland (Sales & Engineering HQ)

+48 22 538 72 19

📍

Headquarters & Manufacturing

ul. Postępu 14, 02-676 Warszawa, Poland