ENERGIZING REMOTE ISLANDS IN TONGA WITH MINI GRID SOLAR SYSTEMS

Remote Monitoring Solution for Monaco Communication Power Systems

Remote Monitoring Solution for Monaco Communication Power Systems

Ready to Take Your Remote Asset Monitoring from Reactive to Predictive? Optimize your equipment with Monico's preconfigured remote condition monitoring systems. The D-21, D-21G, and D-21M Radio Alarm Systems (referred to as the D-21 throughout this document) are Windows®-based Radio Central Receiving Systems. A system can consist of a single client/server workstation or of a server with multiple clients on a LAN or WAN network. Many OEMs charge exorbitant fees via long-term contracts to provide partial data, averaged over time, and packaged in a way that isn't readily usable or applicable. Process or facility supervisors and other staff are supplied with real-time performance statistics, which provide critical information on the system's. Remote monitoring tools deliver continuous oversight of IT infrastructure networks, servers, applications, and critical systems from anywhere. This ensures not only efficiency and safety, but also facilitates proactive maintenance.

Read More
Do relay protection systems need to be calibrated annually

Do relay protection systems need to be calibrated annually

110 (4), ER (Electricity Regulations) 1994; any protective relay and device of an installation will need to be checked, tested and calibrated by a competent person at least once every two years, or at any time as directed by the Energy Commission. Many operators carry out secondary injection annually to ensure relays that protect circuits against overloads or faults operate appropriately. Q1: Do numerical relays require calibration? Numerical relays usually need validation of input signals (CT/PT accuracy) and firmware settings rather than traditional calibration. In most cases, the age and state of the relay, along with the manufacturer's recommendations, will be used to determine if more. If you've got relays in adverse conditions such as elevated humidity, dirt or temperature, then annual checks might be a good idea. This directive is intended to cover all protective relays, relay communication equipment, and disturbance monitoring equipment (collectively referred to as protection systems) associated with all 230kV and above transmission lines and associated facilities, all interconnection lines and facilities.

Read More
Testing Solar Photovoltaics with a Multimeter

Testing Solar Photovoltaics with a Multimeter

Different solar panels will have information on the sticker on the back showing how to test. To measure the voltage of a DC circuit, you should prepare your multimeter by plugging the black probe. It's possible to use a multimeter to determine how much current your solar panel is outputting, but you'll need an extra piece of equipment first.

Read More
Relay Protection Design for Wind Power Systems

Relay Protection Design for Wind Power Systems

Abstract−To avoid undesirable disconnection of healthy wind generators (WGs) or a wind power plant, a WG protection relay should discriminate among faults, so that it can operate instantaneously for WG, connected feeder or connection bus faults, it can operate after a. For those not familiar with the different elements that form a WEP, commonly known as a Wind Farm, this report introduces a description of the different elements comprising a wind farm and how their unique characteristics may be considered to provide a proper design. First, the amplitude and attenuation characteristics of short circuit current in different types of wind turbines are analyzed, as well as the contributing factors to short-circuit current in wind farms. Protection of Wind Electric Plants is a report covering engineering considerations for the design of protection systems and present relay protection and coordination practices at wind electric plants. Abstract—A wind electric plant (WEP) is made of many wind turbine generators spread over a large area and includes many subsystems that need to be protected.

Read More

Get In Touch

Connect With Us

📱

Poland (Sales & Engineering HQ)

+48 22 538 72 19

📍

Headquarters & Manufacturing

ul. Postępu 14, 02-676 Warszawa, Poland