Requirements for the bedding layer of primary distribution boxes
This document represents the minimum requirements and specifications for the installation of the electrical underground distribution systems fed from padmounted transformation, serving Secondary Service Accounts, to be transferred to Oncor Electric Delivery Company ownership. This document also provides requirements of what facilities are allowed within the same enclosure. The information provided in this document contains general descriptions, technical characteristics and/or recommendations related to products/solutions. This document is not intended as a substitute for a detailed study or operational and site-specific development or schematic plan. Note: ASTM standards ar yrighted; the Developer and/or its agent(s) are advised ich includes organic soils, peat, black loam, sod, clay that has hardened. It takes the incoming power and safely distributes it to different circuits throughout your building.
Read More